A well-executed electrical design starts before any drawing: it starts with the load survey. The survey determines the capacity of the power supply connection, the number of circuits, the conductor sizes and the protective devices.

By Eng. Eduardo FigueiredoOctober 12, 2026Updated October 17, 20267 min read

What a load survey is

It is the list of all the equipment and points that will consume power in the installation, with their power ratings. It includes lighting, sockets, motors, air conditioning, process equipment, pumps, lifts and planned future loads.

  1. How much is installed? The sum of the power ratings of all equipment, known as installed load.
  2. How much will be used at the same time? The maximum demand, obtained by applying demand factors, because not everything runs simultaneously.
  3. How much will it grow? The spare capacity for expansion, which avoids having to rebuild the power supply connection within a few years.

Why it is the foundation of the design

Once the demand is defined, the designer can:

  • Size the power supply connection in line with the local distribution utility’s standards
  • Divide the installation into circuits balanced across the phases
  • Size conductors by current-carrying capacity and voltage drop
  • Select circuit breakers, residual current devices (RCDs) and surge protection
  • Size distribution boards, transformers and generators, where applicable

An underestimated survey leads to overheating, tripping and fire risk. An overestimated survey makes the project more expensive than necessary.

ABNT NBR 5410: the design and installation standard

ABNT NBR 5410 covers low-voltage electrical installations. It sets criteria for protection against electric shock, overcurrent and overvoltage, as well as rules for sizing, component selection and final verification of the installation.

The edition in force is the 2004 one. The standard is under review: according to O Setor Elétrico, the first national consultation took place between November 2023 and February 2024, a second consultation was expected and publication of the new text was scheduled for the end of 2026. For this reason, every design should state the version of the standard adopted.

Other standards usually come into the same design: ABNT NBR 14039, for medium voltage, and ABNT NBR 5419, for lightning protection systems (SPDA).

NR-10: safety in electrical installations and services

NR-10 is the Ministry of Labour and Employment (MTE) standard on the safety of people who work with electricity. While NBR 5410 says what the installation must be like, NR-10 says how to protect the people who design, assemble, operate and maintain it.

Electrical design is one of the points where the two standards meet. NR-10 requires, for example, the design to provide disconnection devices that prevent accidental re-energisation and single-line diagrams to be kept up to date.

What changes with the new NR-10

On 1 June 2026, MTE Ordinance No. 737/2026 was published, containing the new wording of NR-10. It comes into force on 1 June 2027. Until then, the current text, from MTE Ordinance No. 598/2004, applies.

Points in the new text that directly affect electrical design:

TopicNew NR-10 (MTE Ordinance 737/2026)
DisconnectionDisconnection devices that prevent re-energisation
Descriptive specificationMandatory minimum safety items
Residual current protectionHigh-sensitivity RCD (or other technology) in the situations listed
Arc flashIncident energy study, where applicable
UpdatingDesign kept up to date throughout the life of the installation
Installation records (PIE)Requirement redefined, focusing on the electrical power system and on medium and high voltage
Responsible professionalA legally qualified professional (PLH), registered with the professional council, is answerable for the design

The ordinance also provides that RCDs on socket circuits in non-residential areas that are wet or subject to washing will only be required in existing installations one year after it comes into force. For companies, the recommendation is to review designs and installation records during 2026 and 2027.

Checklist: what to ask for in the electrical design

  1. Calculation report with load survey and demand
  2. Single-line diagram and load schedules per circuit
  3. Sizing of conductors, protective devices and earthing
  4. Descriptive specification with safety items
  5. Statement of the standards and versions adopted
  6. Design ART registered with CREA

How EF Engenharia e Soluções works

EF Engenharia e Soluções prepares electrical designs based on the load survey, with a calculation report and ART, and also carries out the installations. We serve industrial, commercial and real estate clients throughout Brazil.

Frequently asked questions

What is the difference between installed load and demand?

Installed load is the sum of all the equipment. Demand is what is actually used at the same time, calculated using demand factors.

What is the difference between NBR 5410 and NR-10?

NBR 5410 defines how a low-voltage installation must be designed and built. NR-10 defines the safety measures for people who work with electricity.

When does the new NR-10 come into force?

On 1 June 2027, one year after the publication of MTE Ordinance No. 737/2026.

Has NBR 5410 been updated?

The edition in force is the 2004 one. The review is under way and should result in a new text; check the current version with ABNT before starting the design.

Does an electrical design need an ART?

Yes. Design is an engineering service and is subject to an ART, registered by the responsible professional.

Need an electrical design or want to bring your installation into line with the new NR-10? Talk to EF Engenharia e Soluções.